Mining the Revit Model for Element Location & Quantity & Visualizing in PowerBI Tied to Cost, Schedule & Supply Chain to Improve Design & Project Controls

Time: 1:40 pm
day: Track 2 - Day 1

Details:

• Hearing how cost and schedule can be tied using a primary key attached to each elements of the BIMnmodel in AZURE SQL to transform visibility of project productivity
• Understanding how an element driven project rather than a labour driven project improves planning and is data driven.
• Understanding how calculating task length of each element can better forecast the task and project status and hence react to delay risk sooner
• Gaining transparency of the supply chain of each BIM element to identify risks and informing design and client choices